Drainage Details

Some typical design details are presented in the following figures. Figure 13.40 shows the typical details for a drainage channel to be installed in the verge between the pavement and a cutting slope, Fig. 13.41 shows the likely details to be employed

hard shoulder, hardstrip
or carriageway

min. 1.20 m

Fig. 13.40 Cuttings — Standard concrete channel in verge with drain and pipe

central

hard shoulder, hardstrip

reserve

or carriageway

"New Jersey”

crash barrier

Fig. 13.41 Drain for use in conjunction with concrete barrier and linear slot drainage channel

hard shoulder, non-pavement verge made

hardstrip or of impervious material

carriageway

Fig. 13.42 Cutting — Combined surface water and groundwater filter drain and drain pipe

concrete

channel

in the vicinity of a traffic safety barrier such as appears in a central reservation, Fig. 13.42 shows a typical combined drainage system for both surface runoff and subterranean water collection whilst Fig. 13.43 shows a subterranean fin drain ar­rangement for pavement sub-drainage.

Updated: 26 ноября, 2015 — 6:59 дп