Exploring Your Options

To assess the framing hidden behind finish surfaces, go where it’s exposed: the basement and the attic. Joists often run in the same direction from floor to floor.

Generally, a girder (also called a carrying timber or beam) runs the length of the house, with joists perpendicular to it. Some houses will have framed cripple walls (short walls from the top of a foundation to the bottom of the first-floor joists) instead of a girder. Main bearing walls often run directly above the girder, but any wall that runs parallel to and within 5 ft. of a girder or cripple wall is probably bearing weight and should be treated accordingly.

Bearing walls down the middle of the house are also likely to be supporting pairs of joists for the floors above. That is, most joists are not continuous from exterior wall to exterior wall—they end over bearing walls and are nailed to companion joists coming from the opposite direction. This allows the builder to use smaller lumber—

2x6s rather than 2x8s, for example—to run a shorter span. If you cut into such a bearing wall without adding a header, the joists above will sag.

Large openings in obvious bearing walls are often spanned by a large beam or a header that supports the joists above. These beams, in turn, are supported at each end by posts within the wall that carry the load on down to the foundation. These point loads must be supported at all times. Similarly, large openings in floors (stair­wells, for example) should be framed by doubled headers and trimmers that can bear concentrated loads.

Подпись: are always surprises once you start. If you plan to remove walls, be sure to hire a structural engineer to review your plans. Framing Walls The framing of walls is arguably the most common carpentry task in renovation, and it employs many of the layout and assembly techniques you'd use elsewhere to construct walls, floors, and roofs. For a deeper look at carpentry, consult Rob Thallon's Graphic Guide to Frame Construction or Mike Guertin and Rick Arnold's Precision Framing, both published by The Taunton Press. Basically, wood-frame walls are an array of vertical studs nailed to horizontal top plates and sole (bottom) plates. Depending on whether walls are bearing or nonbearing, plates may be doubled. Although 2x4 walls are more common and less expensive, 2x6 walls allow you to install thicker insulation and route pipes more easily. To simplify matters, the examples in this section assume 2x4 framing. HANDLING LUMBER Here are a few lumber-handling tips that'll save energy and make the job go quicker. Minimize moves. Lumber is heavy. Tell your lumberyard to load the delivery truck so that the lumber you'll use first—say, floor joists—will be on the top of the load. Clear a level place close to the work site where the truck can unload. Many suppliers have boom trucks that can unload lumber stacks directly onto a work deck. Sort your lumber. Lumber today is often bowed, so eyeball each piece for straightness—and sort it into like piles. Save the straight stock for kitchen and bathroom walls—especially those that will get cabinets or be tiled—and for corners, top wall plates, and jack studs along rough openings (ROs). Pieces with slight bows (J4 in. in 8 ft.) can be used as studs and joists, but draw an arrow on the face of the lumber to indicate which way the lumber bows so you remember to place slightly bowed joists crown (bow) up, so they'll be less likely to sag when loaded. Set aside stock that bows more than '/ in. in 8 ft., which you'll cut shorter and use as headers, cripple studs, and blocking. Return corkscrew (twisted) studs to the lumberyard for credit. Be methodical. Snap chalklines onto floors to mark wall plates. Cut top and bottom plates. Then mark stud locations and ROs onto the plates. Make a cutting list: By cutting same- length lumber all at once you'll save a ton of time. If possible, cut lumber or plywood right atop the stack that the lumberyard truck delivered. Finally, it may be wise to leave a wall where it is if pipes, electrical cables, and heating ducts run through it. Look for them as they emerge in unfinished basements or attics. (^) Electrical wiring is easy enough to remove and reroute—but disconnect the power first! However, finding a new home for a 3-in. or 4-in. soil stack or a 4-in. by 12-in. heating duct may be more trouble than it’s worth.

Подпись: t AIПодпись: Precut studs save labor and time; they're available in several lengths. Buy 92У,-ІП. studs if finished ceiling heights are 8 ft. (92У4 in. + 3 in. for two wall plates = 95V4 in.), 88-in. studs if the ceilings are 7 ft. 6 in., and 104-in. studs if the ceilings are to be 9 ft.Подпись: 1111

NAILING IT

On larger renovations these days, pneumatic nailers do most of the work, but it’s worth know­ing how to use a hammer correctly. Then you’ll create fewer bent nails, splits, and dings (dented wood when the hammer misses the nail), and perhaps avoid a smashed thumb, tendonitis, and joint pain.

The perfect swing. If you’re driving large nails such as 16d commons, start the nail with a tap. Then, with a relaxed but firm grip on the end of the hammer handle, raise the hammer head high and swing smoothly from your shoulder. If you’re assembling stud-wall elements, spread them out on a deck, put one foot on the lumber to keep it in place, bend forward slightly, and let the falling hammer head’s weight do some of the work. Just before striking the nail, snap your wrist slightly to accelerate the swing.

However, if you’re driving smaller nails (6d or 8d), you won’t need as much force to sink them. So choke up on the handle and swing from the elbow. Choking up is particularly appropriate if you’re driving finish nails because you’ll need less force and be less likely to miss the nail and mar the casing. It’s also necessary to choke up when there’s not enough room to swing a hammer freely or where you must drive a nail one-handed in a spot that you need to stretch to reach.

Work SAFELY

Put first-aid kits and fire extinguishers in a central location where you can find them quickly. Likewise, gather hard hats, safety glasses, hearing protection, and respirator masks at the end of each workday so they’ll be on hand at the start of the next.

image318

I Loads and Structure

image319

Подпись:Подпись:image320Plywooc

To nail plywood panels 1k in. thick or less, most codes specify 6d common nails spaced every 6 in. along the panel edges and every 12 in. in the field. Panels thicker than % in. require 8d common nails spaced in the same pattern. (Structural shear walls are typically nailed with 10d nails 4 in. to 6 in. on center along the edges and 12 in. on center in the field, but an engineer should do an exact calculation.)

Don’t overdrive nails. Ideally, nail heads should depress but not crush the face ply of the plywood. Panel strength isn’t affected if nail heads are overdriven by %6 in. or less, but if more than 20 percent of the nail heads are % in. or deeper, the American Plywood Association recommends adding one extra nail for each two overdriven ones.

Dnanm<>fif<.iiailav nmr. i______________________________________________________________________________ i

sure that’s too high is the most common cause of overdriven nails. It’s far better to set the nailer pres­sure so the heads are flush, and then use a single hammer blow to sink each nail just a little deeper.

Подпись: The right nail. The nailing schedule given in "Recommended Nailing Schedule,” on the facing page, suggests the size and number of nails you need for various framing tasks, but local building codes will have the final say. When joining two pieces of framing lumber, nails should be long enough to penetrate the second piece of wood, without sticking out its other side. Properly sized nails are also less likely to split board ends. As the table indicates, use two 16d nails to end-nail a stud through a plate, and four 8d nails, which are shorter and skinnier than 16d nails, to toenail stud ends to sole plates. Speaking of splits, you can reduce them by first hammering nail points to blunt them. Removing nails. Everybody inadvertently bends nails now and then, especially when nailing at an odd angle or in a tight space or nailing into a hard wood like southern pine. To remove a bent nail, slip a block under a claw hammer head to increase the leverage as you pull out the nail; if the nail head is buried too deep to grasp with a claw hammer, use a cat's paw, which has pointed claws, to dig it out. LAYING OUT WALLS Wall layout varies, depending on whether you're erecting walls in open space (say, framing an addition) or within existing space (adding a parti- NAILING TIPS

image322

A wood block under your hammer head makes nail-pulling easier.

 

To nail where it’s hard to reach, start the nail by holding it against the side of the hammer and smacking it into the wood. Once the nail is started, you can finish hammering with one hand.

 

A blunted nail point is less likely to split wood because it will crush the wood fiber in its path rather than wedging it apart, as a sharp nail point does.

 

image321

Подпись: Assembling a wall on the ground is no guarantee that lumber edges will line up. Here, a builder uses his hammer to raise the top plate flush to the header, before nailing. Wear safety glasses when using a pneumatic nailer.image323Подпись: Recommended Nailing Schedule* APPLICATION SCHEDULE Joist to sill or girder (toenail) 3-8d Ledger strip 3-16d at each joist 1x6 subfloor or less to each joist (face-nail) 2-8d (or 2-І3/ staples) Wider than 1x6 subfloor to each joist (face-nail) 3-8d 2-in. subfloor to joist or girder (blind-nail and face-nail) 2-16d Sole plate to joist or blocking (face-nail) 16d at 16 in. o.c. Top plate to stud (end-nail) 2-16d Stud to sole plate (toenail) 4-8d Sole plate to joists or blocking 3-16d at 16 in. o.c. Doubled studs (face-nail) 10d at 24 in. o.c. Doubled top plates (face-nail) 16d at 16 in. o.c. Doubled top plates, lap-spliced (face-nail) 8-16d Continuous header, two pieces 16d at 16 in. o.c. along each edge Rim joist to top plate (toenail) 8d at 6 in. o.c. Ceiling joists to plate (toenail) 3-8d Continuous header to stud (toenail) 4-8d Ceiling joists, laps over partitions (face-nail) 3-16d Ceiling joists to parallel rafters (face-nail) 3-16d Rafter to plate (toenail) 3-8d Built-up corner studs 16d at 24 in. o.c. Built-up girders and beams 20d at 32 in. o.c. along each edge * From the Uniform Building Code/1997. Whittier, California. International Conference of Building Officials. Reproduced with permission of the International Code Council. All rights reserved.

tion). In both cases, use house plans to position walls. Snap chalklines onto subfloors (or floors) to indicate wall sole plates. If you’re building a wall within a room, next measure from existing framing to determine the height and length of the new wall, as described in "Reinforcing and Repairing the Structure,” on p. 165. Finally, mark the locations of ROs, wall backers (blocking you nail drywall corners to), and studs into plates.

The easiest way to frame a wall is to construct it on a flat surface and tilt it up into place. Once the wall is lifted, just align its sole plate to a chalkline on the floor sheathing. This construc­tion method is also stronger, because you can end-nail the studs to the plates rather than toe — nailing them. Sometimes, there’s not enough room to tilt up walls, a situation which is addressed later in this chapter.

I Stud-Wall Elements

image324

If you use doubled 2x6s for your header in a rough opening in standard 8-ft. wall framing, you need cripple studs to support the doubled top plate. If you use a 4×12 instead, it will support the top plates. Although code may allow a single top plate for nonbearing walls, a single plate offers little to nail drywall to, if the ceiling is finished before the wall.

Подпись: A Speed Square is used to mark stud locations on a pressure-treated mudsill (sole plate) and a top plate. An Xusually indicates regular studs 16 in. on center; a _/,jack studs; a K king studs; and a C, cripple studs. The sole plate has been predrilled so it will fit over the anchor bolts when the wall is assembled and lifted into place. I Stud Layouts________

STUD-AND-PLATE LAYOUT

Подпись: Marked stud edges

Mark stud edges on plates so that stud centers will be spaced 16 in. on center (O. C.).

Distances (O. C.)

48 in.

16 in.

16 in.

16 in.

X

X

<

X

X

<

151/4 in.

in.

31 1/4

47’/4 in.

Подпись: PROnP When partitions run perpendicular to the joists, center the studs over the joists whenever possible. Aligning studs and joists creates straight, open channels from floor to floor, so plumbers and electricians can easily drill through plates and run wires and pipes. Partitions that ran parallel to and directly over the joists would be a big problem if you needed to run wires or pipes. Instead, consider moving the partition 1 in. to 2 in. to avoid the joist. 1111 image326

Mark rough openings. Place the sole plate, face up, next to a chalkline; then place a top plate next to it, so that edges butt together and the ends align. Use a square to mark the top plate and the sole plate at the same time. (If the top plate is doubled, there’s no need to mark the upper top plate.) Using a tape measure, mark the ROs for doors and windows. Rough openings are so named because they are about 1 in. wider and 1 in. higher than preframed doors or windows (so units can be shimmed snug) and 2h in. wider and higher than unframed units.

As you mark the width of the RO on the plates, keep in mind that there will be a king stud (full length) and a shortened jack stud (also called a trimmer stud) to support the header on each side of the opening. After marking the ROs, mark the corner backers (also called wall backers)— extra blocking for drywall where partitions inter­sect with the wall you’re framing. "Corner-Stud Layouts” shows several backer configurations.

Mark studs on the plates. After marking the first stud, which is flush to the end of the plates, mark the subsequent studs 3з4 in. back from the red 16-in.-interval highlights on your measuring tape. (In other words, mark stud edges at 1514 in., 3114 in., 4714 in., and so on.) By marking stud edges 3з4 in. back, you ensure that stud centers will coincide with the edges of drywall or sheathing panels, which are usually some multiple of 16 in., for example, 48 in. by 96 in.

Mark studs every 16 in. on center on plates— through the ROs as well—so that drywall or sheathing panels running above or below open-

CORNER-STUD LAYOUTS Corners require at least three studs to provide adequate backing for finish materials. In the first example, the middle stud need not be continuous, so you can use pieces.

image327

image328

image329

For standard 8-ft. wall framing, cut studs 92‘/4-in. long. One bottom plate and two top plates will be roughly 41yfe in. thick, creating a wall height of 963/ in. This height accommodates one drywall panel (*/! in. to 5/i in. thick) on the ceiling and two 4-ft.-wide drywall panels run horizontally on the wall. If you install a 4×12 header directly under the top plates of a standard wall, the rough opening height will be 821/ in. This is just right for a 6 ft. 8 in. door, and door head heights will match that of the windows.

Подпись: STANDARD ings can be nailed to cripple studs at regular intervals. At window openings, you’ll mark crip­ple studs on both the top and the bottom plates. But on door openings, you’ll mark cripple studs on the top plates only. Note: For door openings, where 16-in. on-center studs occur within 2 in. of a king stud, omitting the 16-in. on-center stud will not weaken the structure.