Detail Design Phase

During the detail design phase, various design elements are finalized and construction plans are developed. Project development in this phase can include many intermediate reviews prior to final plan submission. These may include some or all of the follow­ing, depending on the complexity of the plan:

Traffic request/validation Traffic signal warrant analysis Airway-highway clearance study Alignment, grade, and typical section review Conceptual maintenance of traffic review Structure type study Retaining wall justification Service road justification Preliminary drainage review Preliminary right-of-way review Bridge type, size, and location study Drive review

Detail Design Phase

FIGURE 2.1 Example of map used in study of alternate routes showing four possible corridors. Conversions: 5 mi = 8 km, 2000 ft = 610 m. (From Justification Study for Crossroad Grade Separations, US 30, by Balke Engineers for Ohio Department of Transportation, with permission)

ALIGNMENT

 

Ml RELOCATION

 

_C0NRAIL

 

|E<fenvi]|»"

 

-J

го

 

<-C~

 

ALIGNMENT C

 

£crWj.’ J

 

LEGEND

Residence With Farm Buildings

 

Residence Only

 

Commercial Facility

 

Residence With Potential Historic Significance

Overpass

Road Closure tcul-de-sac)

 

Unr^n.

 

Detail Design Phase

.I»,SHAFER ROAD

 

©

LEGEND

Residence Wilh Farm Buildings

Residence Only

©

Commercial Facility

©

Residence With Potential Historic Significance

an

Overpass

Road Closure (cul-de-sac)

 

BARTHOLD ROAD —y

 

jOUAKER ROAD

 

ВUCYRUS BYPASS;

 

RIWEHARTROAD-

 

jSHROLLROAD

L — Jtr nil

 

I US 30

 

CR S5

 

NEVADA-WYNFORD ROAD

 

со

 

_CONRA|L

 

CR 2

 

ВЦCYRUS-NEVAPA ROADI

 

Detail Design Phase

Detail Design Phase

Detail Design Phase

6610

 

.1GNMENT D

 

:|SR 182f:

 

Lsx-

 

CONftAH

 

iZfpP

>Ь : ЕЗєпуіііє"" O’

 

■рь

 

<1 TR 55 |

 

ALIGNMENT C

 

Detail Design Phase

180 = Estimated 2000 ADT 270 = Estimated 2020 APT

 

Detail Design Phase

;Гц

 

Detail Design Phase

2840

4250

 

6700

10500

 

US 30

 

BARTHOLD ROAD^

 

Detail Design Phase
Detail Design Phase

BUCYRUS BYPASS’

 

RINEHART ROAD

 

,SHRQLL ROAD

 

I US 30

 

NEVADA-WYMFQRD ROAD J—‘

 

J CR 18 Г

 

-J

сл

 

_CONRAIL

 

Detail Design Phase

BUCYRUS-NEVADA HO АРІ

 

Detail Design Phase

Detail Design Phase

Slope review Traffic control Lighting Waterline Sanitary sewer

Final roadway, field and office check

This is not intended to be an all-inclusive list. The designer should contact the government agency having review and final acceptance authority to see what reviews are required during this phase of plan development.

Following acceptance of the final plans, specifications, and estimates, the project is processed for letting. Any necessary consent legislation is obtained. The project is then advertised, bids are taken, and the construction contract is awarded.