The last piece of siding at the top of an eave wall can be fastened in different ways. If the eaves will be left open, use strips of undersill trim and cut and fasten the final panel in the same way as the one under the window. If the eaves will be closed with soffit material (as was done on this house), the uppermost sid
ing panel can simply be nailed in place above the level of the soffit. The J-channel trim for the soffit, and then the soffit itself, will cover the top siding panel.
Begin by nailing 2×2 blocking between the lookouts and along the barge rafter, as shown in the illustration on the facing page. This allows J-channel to be nailed up the rake, where it can receive the angled ends of the siding panels. Some builders prefer to hold the J-channel Zi in. down so the soffit pieces can simply lie on top of it, as shown in the illustration.
To ensure accurate angled cuts where the siding panels meet the rake, make a pattern from a short scrap of vinyl siding, with the angle cut to match the roof’s pitch. If you really want to save time, however, set up a circular saw guide at the proper angle on the worktable.
As you cut and fit these pieces on the gable end, be sure to leave a 14-in. space between the siding and the inside of the J-channel. If there are gable-end vents, cut and fit pieces around the vents, just as you did for those around the windows and doors. The last small piece at the peak can be cut and secured to the wall with a small screw or nail.
The vinyl soffit panels are filled with small holes so air can pass into the attic space. . .
They finish off the eaves nicely. . .
|