Two nails at 24" O. C.
Fascia
Framers (and the eventual homeowner) like to have the roof installed as soon as possible. The roofing provides a dry workspace and protects all the installed framing from the weather. Be careful not to leave hammer head marks in the fascia, since it is a finish product.