Step 16-Plumb & Line (continued)
| 
 
 | |
| 
 
 | |
| 
 
 | |
| 
 
 | 



Use crowbar to rack brace and wall. Turn brace around if wall
needs to be racked in other direction.
Racking a wall is moving the top of the wall with the bottom secure until the wall is plumb.
One framer racks the wall with a brace and crowbar, while the second framer checks for plumb.






Leave a reply